DEMO Placeholder project — illustrative content generated to fill a gap, NOT yet verified with the client.
The Energy Regulatory Commission's stone-clad panels and blue glass façade
All case studies

Façade · Windows · Sun shading

Energy Regulatory Commission

Ulaanbaatar, Chingeltei District

Client
Energy Regulatory Commission
Our role
Manufacture · Installation
System
Reynaers CW 50 · CS 68
Reynaers system
CW 50

01

The challenge

The government office building needed an official, composed appearance together with a well-controlled working environment under strong sun. The front offices required protection from overheating.

02

Our solution

We combined the Reynaers CW 50 curtain wall and CS 68 windows with terracotta composite panels and added fixed sun-shading louvres on the front to reduce overheating. Panels, glass and shading form one orderly façade.

03

The plan

We set the louvre depth and spacing from a solar-angle study and staged the deliveries of panels, glass and profiles.

04

Implementation

The façade, windows and sun shading were fully installed, handing over a composed building appropriate to a government institution.

Design concept — content not approved.

Let's start your project together.