MH Tower's tall glazed façade in evening light
All case studies

Material supply · Office tower

MH Tower

Ulaanbaatar, Chingeltei District

Client
Eco Construction LLC
Installer
Ulemj LLC
Our role
Reynaers material supply
System
Reynaers CW 50 HI · CS 77
Reynaers system
CW 50 HI

01

The challenge

A high office tower in Chingeltei District required high-insulation, certified curtain-wall and window systems supplied as a complete package.

02

Our solution

We supplied the Reynaers CW 50 HI curtain wall and CS 77 window-and-door systems, supporting the installer with profile take-offs and technical advice.

03

The plan

A delivery schedule matched the tower's installation sequence, with material arriving floor-set by floor-set.

04

Implementation

Ulemj LLC completed the installation and the tower entered service on genuine Reynaers systems.

Design concept — content not approved.

Let's start your project together.